![]() Lay the 288mm C-Channel from Steps 1&2 perpendicular to the first two channels, with the open side facing toward you, over the bottom set of holes with washers.Lay a 416mm C-Channel perpendicular to the first two channels, with the open side facing toward you, over the top set of holes with washers.Place a set of two washers over each of the indicated holes in Figure 2.Lay two of the 416mm C-Channels down parallel to each other, with the open sides facing downward.Attach the assemblies from Step 1 to the right and left ends of the 288mm C-Channel with the axle hubs and screw heads facing outward.The screw heads should be inside the inside C-Channel. Attach a drilled/tapped 4-hole angle bar to the axle hub using the drilled holes.The screw heads should be toward the inside of the inner C-Channel, with the the hub flange in the large hole. Screw together an inner C-Channel, an axle hub, and a drilled/tapped 4-hole angle bar using long TETRIX screws.Angle Bars (Use the 4-hole ones that you drilled holes into).Long Socket Head Screws (1/2” long 6-32).Short Socket Head Screws (5/16” long 6-32).GT2 20-tooth pulley with 2m of timing belt ( pack).Heating wire (12V), Thermistor, Heating block, 0.4mm nozzle ( pack).SO, WHERE SHOULD YOU GET ALL OF THAT FROM? NEMA 17 stepper motors (57 oz and 40 oz).PTFE Teflon Bowden Tube for 1.75mm Filament.Flat Round Spacers (Instead of Flat Building Plates - less manufacturing, but more expensive). ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |